How soon can the walls be backfilled after installation?

Print FAQ      Email FAQ

Question:

How soon can the walls be backfilled after installation?

Answer:

To comply with building code requirements, the wall must be supported at both the top and bottom of the wall prior to the placement of backfill. This means that the framing/decking connection at the top of the wall must be completed and the floor slab at the bottom of the wall must be installed prior to backfilling.